Resources for Property Managers
Water Efficiency and Drought Guide
On this page
TLDR
- Fix leaks and broken heads first. They deliver the largest saving for the least money.
- Seasonal schedule adjustment is the second largest saving and costs almost nothing.
- Replanting comes last, not first. Most properties save more by fixing what they have.
Cutting landscape water use here follows a clear order. Repair what is broken. Fix the schedule. Convert beds from spray to drip. Then change the planting. Programmes that start with replanting spend the most and return the least early on.
The right order of operations
Water efficiency work has a natural sequence based on cost against saving. Doing it out of order is the most common reason a conservation program disappoints, because the expensive steps get taken before the cheap ones.
| Priority | Action | Relative cost | Relative saving |
|---|---|---|---|
| 1 | Repair leaks, broken heads, and failing valves | Low | High |
| 2 | Correct controller schedules seasonally | Very low | High |
| 3 | Fix coverage uniformity and pressure | Moderate | Moderate |
| 4 | Convert bed and shrub areas from spray to drip | Moderate | Moderate |
| 5 | Install a weather based smart controller | Moderate | Moderate |
| 6 | Convert turf to low water planting | High | High but slow |
Working within watering restrictions
Southern California water agencies set their own restrictions, and they differ meaningfully between districts. A property in Los Angeles under LADWP operates under different rules than one a few miles away in a different district, which means compliance cannot be assumed from a regional generalization.
Restrictions typically govern allowed days and times rather than volume, which makes cycle and soak scheduling more important. When the permitted window is short, splitting run time into absorbing cycles is often the only way to deliver adequate water without runoff.
Proving the savings actually happened
Efficiency work that is not measured is efficiency work that ownership has no reason to believe in. Establishing a baseline before the work is the difference between a documented result and a claim.
- Record consumption for at least a full year before the work as a baseline
- Document what was changed and when, so effects can be attributed
- Track consumption after the work against the same period the prior year
- Normalize for weather so a wet year is not credited to the program
- Report the result with the method stated, not just the number
What your water district can change, and when
Water rules in Southern California are set locally, not at the state or county level, and that catches a lot of people out. Two properties four miles apart can be under different day limits and different penalty structures.
Rules also change with conditions, sometimes in the middle of a season. A schedule that was legal in April can be over the limit by August without anyone at the property doing anything.
The practical effect is that a landscape program has to be able to move. A property watering three days a week does not simply run the same cycles less often. It needs longer, better placed cycles, on zones that were grouped sensibly in the first place.
- Which district serves the property, which is not always the obvious one
- The current day and time limits, and whether they are advisory or enforced
- Whether penalties are tiered on usage or flat
- What rebates are currently open, because they change more often than the rules
- Who at the district actually answers questions, which is worth knowing before you need it
The meter problem
Most commercial properties have one water meter. Building use and irrigation run through it together, which means the landscape share of the bill is a guess.
That is a bigger problem than it sounds. It makes every efficiency project unprovable. You cut irrigation use by a third, the bill drops by eight percent, and nobody can say whether that was the irrigation or a quiet month in the building.
A dedicated irrigation meter fixes it permanently. It is a small project, often eligible for a rebate, and it turns every future water claim from an argument into a number.
Without a separate irrigation meter, every water saving on the property is an opinion.
The order to do things in
Water projects have a natural order, and doing them out of order wastes money. The rule is simple: fix, then tune, then upgrade, then redesign.
Fixing is repair. Broken heads, leaking valves, heads spraying pavement. It costs little, needs no approval, and until it is done nothing else you do will show up in the numbers.
Tuning is scheduling. Seasonal run times, cycle and soak on slopes and clay, and turning off zones that no longer need to run. Also nearly free.
Upgrading is hardware. Smart controllers, better nozzles, drip conversion in beds. This is where capital starts.
Redesigning is the last step and the largest. Regrouping zones, converting turf, changing the planting. It only pays once the first three are done, because a beautiful new design on a broken system is still a broken system.
- Repair every break and leak first, because nothing else is measurable until you do
- Reprogramme for the season and the soil, which costs only time
- Turn off zones that no longer serve a planting
- Upgrade nozzles and controllers once the system holds pressure properly
- Convert beds from spray to drip
- Only then consider regrouping zones or converting turf
What restrictions actually cost a property
Restrictions are usually treated as a compliance problem. On a commercial property they are also a planting problem, and the second one is more expensive.
Cutting water evenly across a site kills the thirstiest planting first, which is usually the turf and the newest beds. The result is a property that looks under water rather than one that looks efficient, and replanting costs far more than the water saved.
The properties that come through restrictions well are the ones that decided in advance what to protect. Entry planting and anything recently installed get held. Back of house turf takes the cut. That is a decision worth making on paper before it gets made by default in August.
Questions
Frequently asked questions
How much water can a commercial property save?
It depends entirely on the starting condition. A property with unrepaired leaks and a year round fixed schedule has substantial recoverable waste. A property already audited and running a smart controller has much less. The honest answer requires measuring your specific site rather than quoting a percentage.
Should we replace our turf with drought tolerant planting?
Possibly, but not first. Fix the system and correct the schedule before spending capital on conversion. Many properties find that repairs and scheduling alone deliver a large share of the available saving at a fraction of the cost.
Do drought tolerant plants need no water?
No. They need regular water through establishment, typically one to two years, before their drought tolerance takes effect. Cutting water immediately after a conversion is the fastest way to lose the entire planting and the investment in it.
Get Started
Ready for consistent commercial landscape maintenance?
Work with a team that knows what managing commercial property is like. Clear standards, the same crews, and a record of every visit.
Or call (562) 203-3567. Mon to Fri, 7:00am to 5:00pm.